• Home
  • Browse
  • Search
  1. Pontypool and Blaenavon Railway
  2. 2012

PBR Easter Opening 2012

April 6th 2012, opening day for the Pontypool and Blaenavon Railway's 2012 season. Not only was the Easter Bunny on the train but it was also the first regular service trains to the new Big Pit halt. Whilst the weather got decidedly manky it was sunny for the first train. best opening day figures as well.
Read More
Big Pit Halt
33 / 46

Big Pit Halt

  • 71515 stands at Big Pit halt, you can see how the line drops away straight after the platform end.
  • Another service swings round the corner from Big Pit on its way to furnace Sidings. On the left the rail over bridge and below that the mainline to Blaenavon.
  • Steam and Daff's
  • Crossig over to the mainline at Furnace Sidings
  • Storming the hill
  • PBR Easter 2012 ba lr_028
  • PBR Easter 2012 bb lr_029
  • A room with a view
  • From a railway carriage
  • Just checking
  • Big Pit Halt looking back at Big Pit
  • PBR Easter 2012 cb lr_034
  • Big Pit Halt
  • Big Pit Halt with the graded approach for the passengers
  • PD 10 undergoing a repaint
  • PBR Easter 2012 db lr_038
  • PBR Easter 2012 za lr_039
  • PBR Easter 2012 zb lr_040
  • PBR Easter 2012 zc lr_041
  • PBR Easter 2012 zd lr_042
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2021 SmugMug, Inc.